WebMobile

Landowners: the land your trails cross

Keep each landowner's record, their access agreement, its end date and their signed documents, outline their land on the map and see who owns each portion of trail. Sentinel reminds you before an agreement expires.

6 min read · Updated on 2026-11-16

A trail network rarely sits on a single property. A farm, a woodlot, public land: each belongs to someone, and every crossing depends on an agreement. The Landowners section keeps all of it in one place: who owns what, which agreement gives you access, until when, and what the landowner asks for.

Where: left navigation bar, under Trails → Landowners. The entry only appears to members whose role lets them view landowners; only those who can edit them add, change and draw. Contact details are personal information: keep that right for managers. See roles. Landowners are part of the Pro and Community plans: on other plans, the entry shows a lock and the page presents the plan that includes them.

Video · 3:48 — Landowners: every property, its agreementWatch on YouTube

The list

The List tab shows each landowner with their agreement type, when the agreement ends and their phone.

  • A gold In 17 days pill flags an agreement ending soon; Today, on the day itself.
  • A red Ended 12 days ago pill flags an agreement that has already ended and needs renewing.
  • A dash means no end date is set.

Clicking a row opens the landowner's record on the right.

The map

The Map tab shows your trails for the chosen activity, each portion in its landowner's color. Portions without a landowner stay dotted grey.

The floating card on the left is the legend:

  • one row per landowner, with their agreement and their kilometres of trail, longest first;
  • Not set: the kilometres that have no landowner yet.

Clicking a landowner highlights their land and greys out the others; a second click opens their record. The Activity picker at the top of the card changes which trails are shown.

The Map tab: landowners on the left, their land on the map.

  1. 1List and Map, under the section header.
  2. 2The activity shown. The map and the kilometres follow the chosen activity; All activities shows the whole network.
  3. 3A landowner, their agreement and the kilometres of trail on their land.
  4. 4Draw their land, or Edit the zones already drawn.
  5. 5Not set: trail portions without a landowner.
  6. 6A drawn piece of land, in its landowner's color.

Add a landowner

  1. In the List tab, click Add a landowner.
  2. Enter their Name and choose their Type: Person, Company, Public land or Owned by the place (land that belongs to you).
  3. Choose their Color, the color of their land on maps. Sentinel first suggests a color nobody has yet; the color picker at the end of the row offers more.
  4. Fill in their Contact details: phone, email, address.
  5. Click Add.

The agreement

  • Agreement type: Right of way, Registered easement, Lease, Verbal agreement or Owned by the place.
  • Start and End: the end must come after the start.
  • Conditions: what the landowner asks for, such as a closure during hunting season or a call before any work. Everyone on the team who opens the record sees it.

What a right-of-way agreement usually covers in Quebec (term, notice, insurance) and what the law says about the landowner's liability are summed up in our guide Building a trail.

Signed documents

Once the record is saved, Attach a PDF adds the signed agreement, the easement or the survey plan. Clicking a document opens it; the cross removes it. Only PDF files under 20 MB are accepted, up to twenty per landowner.

Outline the land on the map

A landowner's land is drawn as zones. Sentinel works out which portions of trail cross it.

  1. In the Map tab, click Draw next to the landowner (or Edit if they already have a zone).
  2. Click on the map to place the corners of the land, then close the outline on the first point.
  3. The panel on the left immediately lists the Trails crossed, how many and how many kilometres.
  4. Add a zone draws another parcel for the same landowner.
  5. Click Save.

Edit a zone: click it, then drag a corner to change its shape, a + to add a corner, or the inside to move it. The bin in the zone's row removes it. Two zones never overlap: a corner placed near a neighbouring zone snaps to it.

Editing a landowner's zones: their corners, the trails they cross, and a portion that already belongs to someone else.

  1. 1The landowner's zones. Clicking a zone shows it on the map; the bin removes it.
  2. 2Add a zone, to outline another parcel.
  3. 3The trails crossed, with their difficulty. In red, the portion that already belongs to another landowner.
  4. 4Keep that portion with its landowner, or Replace it.
  5. 5A corner, to drag to change the shape. The + between two corners adds one.
  6. 6The conflicting portion, in red: hover over it to see who owns it.
  7. 7Save, enabled as soon as the zones change.

A portion that already has a landowner

If your zone covers a portion already assigned to someone else, it shows in red and the panel says so: "0.4 km already have a landowner". Choose:

  • Keep: the existing landowner keeps the portion;
  • Replace: the landowner you are drawing takes it.

Hover the red portion to see who owns it and what your choice will change.

What updates on its own

Zones follow your trails. When you import trails or update a trail's track, Sentinel redoes its portions from the zones: a new trail that crosses a landowner's land goes to them, and a track moved out of a zone no longer counts for it. Nothing to redraw.

On a trail's page

Each trail's page (Trails → Trails, then click a trail) shows the Land crossed block: a ribbon from kilometre 0 to the end of the trail, one color per landowner, then one row per portion. Clicking a portion opens its landowner's record; Edit on the map opens the map framed on that trail.

Agreement end reminders

Sentinel reminds you 30 days before an agreement ends, then on the day itself. The reminder goes to members who can edit landowners:

  • in the notifications of the web and mobile apps, under Landowners;
  • as a push notification on the phone;
  • by email.

Each member picks their channels in their notification settings, on the Agreement ending line. See notification settings.

Delete a landowner

Open their record, click Delete, then confirm. Their record and signed documents are permanently deleted, and their portions of trail go back to Not set.